Finally finished the base for the growbeds today. Ended up with a different design then what I first thought of... 2x2.8m treated sleepers (75mm thick) sit on 4 blocks which have been core filled with cement. The sump sites under the growbeds and is 1 block high.

Now that the growbed base is done, can finally start on the plumbing!